The partial switch installation how to determine the numbers? Whether to need to install the brackets?
Need to install this switch on both sides of the belts conveyor. We recommend that every 30-35 meters set a pair of switch, should from the conveyor of the nose and tail 10 meters set a switch. Of mounting bracket in use do not need to change, if any, FM series running deviation switch USES is oval mounting holes, flexible installation.